Replaceable Batteries Starting in 2027: Key New EU Requirements That Device Manufacturers and Developers Need to Consider Today
Which products are affected, which exemptions apply, and why manufacturers should already be designing for Battery replaceability The European Battery Regulation (EU) 2023/1542 has been in effect since February 18, 2024. Many companies are already addressing labeling requirements, technical documentation, conformity assessments, and new information obligations. However, additional requirements will be introduced gradually. An important
- Published in Battery Technology
The Right Battery for Access Control, Lock Cylinders, and Electronic Locking Systems
Which Battery Is Best Suited for Access Control Systems? A Comparison of FR, CR, ER, and Lithium Coin Cell Batteries The selection of the right Battery for access control systems and electronic locking cylinders has a significant impact on service life, maintenance requirements, and overall application reliability. Depending on the specific requirements, different battery chemistries
- Published in Battery Technology
Measurement and Control Engineering: Power Supply and Timing as Key Success Factors for Precise, Long‑Lasting Systems
Measurement and control engineering forms the foundation of modern buildings as well as energy, environmental, and emissions technology. Wherever temperature, pressure, humidity, emissions, or flow rates must be reliably measured and automatically controlled, sensors, controllers, and communication modules ensure stable processes—often in 24/7 operation and under demanding conditions. Building automation, smart metering, heating and air
- Published in Battery Technology, Frequency Control Products
Lithium from Geothermal Energy – A Building Block for Europe’s Raw Material Supply?
Lithium-bearing rocks include Buntsandstein sandstone, Rotliegend sandstone, Zechstein dolomite/Zechstein carbonate, pegmatite, and spodumene ore, among others How Lithium Can Be Extracted from Deep Thermal Water Securing a reliable supply of lithium is one of the key challenges facing the Battery industry. While a large share of the raw material required for Lithium-Ion Batteries currently comes
- Published in Battery Technology
From 1976 to 2026: 50 Years of Battery Technology at Jauch
From Market Entry to a Leading Technology Solution Provider for Lithium Batteries: Development, Certification, and Production from a Single Source In 1976, Jauch entered the Battery business with the acquisition of the distribution rights for Renata AG, a Swiss manufacturer of button cells for electronic applications. This marked the start of its Battery distribution activities,
- Published in Battery Technology, The Company
Top-quality energy for precise performance measurement in professional cycling
Batteries from Jauch for ultra-high-precision SRM products For many years, Jauch Batteries have been designed into both the SRM bike computer (Head Unit) and the SRM Spider PowerMeter. The power supply is an integral part of these highly advanced systems and has been consistently maintained across multiple product generations. Both power measurement directly in the
- Published in Battery Technology, Customer Success Stories
Battery Memory Effect: What’s Behind It – and Is It Still Relevant Today?
The so‑called Battery Memory Effect is one of the most well‑known phenomena in Battery technology—and at the same time one of the most frequently misunderstood. Many users still assume that rechargeable Batteries must always be fully discharged. In reality, this assumption applies today to only a very limited number of technologies. What Is the Battery
- Published in Battery Technology
Steasy® – the self‑heating lunchbox now benefits from Jauch Power from Villingen‑Schwenningen.
Flexible, healthy, and warm meals without a microwave — that’s exactly what Steasy®, developed by the Swiss company Nexenic, was designed for. This mobile mini steam cooker, or portable food steamer, lives up to its name: Steasy® combines ‘steam’ and ‘easy,’ perfectly capturing its core principle. Meals are gently heated using steam rather than electromagnetic
- Published in Battery Technology, Customer Success Stories
Realism, precision, and energy efficiency – how Laerdal Labs Vienna is shaping the future of medical simulation with the help of reliable Lithium Polymer Batteries from Jauch.
Laerdal Labs Vienna GmbH develops and manufactures highly realistic patient simulators for neonatal and preterm care in Vienna. The company was founded in 2012 by pediatrician Dr. Jens-Christian Schwindt, originally under the name SIMCharacters, with the mission of improving medical care for critically ill children worldwide.Since early 2024, the team of around 30 employees at
- Published in Battery Technology, Customer Success Stories
Solid State Hype Under Scrutiny – Jauch Evaluates the First Test Results of the Solid-State Battery
At the beginning of the year, the new Solid-State Battery from Donut Lab attracted worldwide attention at CES in Las Vegas. The company promised an energy density of 400 Wh/kg, ultra‑fast charging, and 100,000 cycles — performance figures that exceed today’s Lithium-Ion battery standards by a wide margin, prompting the industry to ask: Is this
- Published in All, Battery Technology


Deutsch 








